jacinda06
Geregistreerd op: 26 Mei 2014 Berichten: 93
|
Geplaatst: 16-09-2014 07:57:11
Onderwerp: saving such as house heating
|
|
|
The installation of the host1. The heat pump host installation is the sa with air conditioner outdoor unit installation requirents. It can be installed in the exterior walls Authentic Zack Martin Jersey , roof, balcony and on the ground. The outlet ould avoid the upwind direction. 2. The distance beeen the host and the storage tank all not be greater than 5 ters, the standard is 3 m. 3. The distance beeen the host and the surrounding walls or other obstructions cannot be too small. 4. If stalling the canopy to protect the split heat pump from wind and sun, you ould be aware to guarantee the host heat exchanger endothermic and radiation not be hindered. 5. Host ould be installed in ple with a solid foundation, and ensure upright installation, and fix with anchor bolts. 6. The control panel ould not be installed in the bathroom, so as not to affect the normal workThe installation of the holding tank1. Storage tanks can be installed with the mini split heat pump outdoor unit in outdoor Zack Martin Jersey , such as the balcony, roof, ground, and can also be installed in the room. Storage tanks must sit ground mount, the installation ould have solid foundation, must withstand the weight of 500kg, cannot be hung on the wall 2. Equipped with a valve near the water storage tank Jeff Heath Cowboys Jersey , and water pipes and hot water pipes interfe. Note: the outlet of the storage tank must be connected to the PPR pipe over 1.5 tersWater connections1. Connect the water interfe with water storage tank by the PP-R pipe aording to the diagram, and seal with the PTFE TAPE. 2. Connect one end of the check valve with the water pipe, and connect the other end to the holding tank inlet 3. Fill with water: Open the tap water inlet valve, open the faucet in the hot water pipes. Injecting water, until the water overflows, turn off the faucet. Storage leak detection, make ensure watertight. Note: For the first ti use Jeff Heath Womens Jersey , make ensure that water storage tanks have been filled before plug the power.Heating pipe connection1. Drill a Ф70 pipe hole in the wall beeen the water storage tank and heat pump host, the hole ould be slightly tilted to the outside. Wrap a certain length of the cable with plastic ties, both sides put wall pipe jket through the lay the pipe hole. 2. Removing the head cap on the tank thickness connecting tube, respectively screw the thickness connecting pipe into the connector on the water storage tank connecting pipe, firmly tighten with a wrench. 3. Screw host high-pressure valve and the head cap of low pressure valve connection nozzle, screw the other end of the thickness connection tube into the water tank working fluid inlet, working fluid inlet connection tube pipe mouth Jeff Heath Elite Jersey , tighten securely with wrench (Note: crude pipe connects to the three-way valve and joints on the tank).Note: Try not to bend the copper pipe, even if distort do not make copper tube fold flat or frture www.phnix-e. is an international enterprise that mits itself to heat pump technology, fixes energy saving and environntal protecting as its developnt orientation. We can provide various solutions for energy saving such as house heating, sanitary and rcial hot water supplying, swimming pool thermostatic dehumifying and central air-conditioning integrated energy saving. ---
|
|